Building System CommissioningĚýmeans, in relation to a Building System, the process by which the Building System is tested by the Developer (including operational and performance testing) to verify and confirm that it performs in accordance with the final Building System specifications agreed and approved pursuant to Section 3.1;
Building System CommissioningĚýmeans, in relation to a Building System, the process by which the Building System is tested by the Owner (including operational and performance testing) to verify and confirm that it substantially performs in accordance with the Final Building System Application, subject to minor defects and deficiencies which do not materially interfere with the performance of the Building System;
Building System CommissioningĚýmeans, in relation to a Building System, the process by which the Building System is tested by the Owner (including operational and performance testing) to verify and confirm that it performs in accordance with the final Building System Application approved pursuant to Section 3.1(e);

Examples of Building System Commissioning in a sentence

  • Upon connection of each Building System to the Energy Transfer Station pursuant to Section 3.3, the Developer will perform Building System Commissioning.

  • During Building System Commissioning, the Developer will take all required steps to remedy any defects in the design, engineering, construction or installation of the Building System identified by the Developer’s Engineer within such period of time as may be reasonably required to remedy such defects and will promptly provide to Corix documentation from the Developer’s Engineer (in a form that is satisfactory to Corix, acting reasonably) verifying that the Building System is Functional.

  • During Building System Commissioning, the Developer will take all required steps to remedy any defects in the design, engineering, construction or installation of the Building System identified by the Developer’s Engineer within such period of time as may be reasonably required to remedy such defects and will thereafter promptly provide to Corix documentation from the Developer’s Engineer (in a form that is satisfactory to Corix, acting reasonably) verifying that the Building System is Functional.

  • These certifications include: CBCP â€� Certified Building Commissioning Professional â€� Association of Energy Engineers CCP â€� Certified Commissioning Professional â€� Building Commissioning Association CPMP â€� Certified Process Management Professional - ASHRAECxA â€� Certified Commissioning Authority â€� AABC Commissioning GroupBSC â€� Building System Commissioning Certification â€� National Environmental Balancing Bureau This list is not exhaustive.

  • Ms. Zimmerman presented the construction professional services, to include WCSD Staff Augmentation, Third Party Special Testing & inspection, Building System Commissioning and WCSD staff.

  • Commissioning services will be provided to meet the requirements of the Building System Commissioning.

  • All tasks must be performed to fulfill the LEED Fundamental Building System Commissioning requirements and Enhanced Commissioning requirements including compliance with LEED version 2009.

Related to Building System Commissioning

  • Building system means plans, specifications and docu- mentation for a system of manufactured building or for a type or a system of building components, which may include structural, electrical, mechanical, plumbing and variations which are sub- mitted as part of the building system.

  • Building Systems means any electrical, mechanical, structural, plumbing, heating, ventilating, air conditioning, sprinkler, life safety or security systems serving the Building.

  • Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.

  • Building Services Definitions

  • Building site means a plot of land held for building purposes, whether any building is actually erected thereupon or not, and includes the open ground or courtyard enclosed by, or adjacent to, any building erected thereupon;