Street Improvements.ĚýInstallation of required interior streets, striping, curbs and gutters, sidewalks, drive approaches, handicapped ramps, street signs, and street lighting, as required on the approved plans or as required by the Conditions of Approval of VTTM 18123.
Street Improvements.ĚýThe distribution of costs between the City and the Developer for all street improvements are as follows: Full Project Cost Assurance Amount City Participation Streets & Sidewalks $1,423,689 $1,779,611.25 $0.00 Erosion Control Items $355,663 $444,578.75 $0.00 Total Construction Cost $1,779,352 $2,224,190 $0.00 Utility Facilities $1,825,323.75 Storm Drainage Facilities $1,228,871.25 Streets, Sidewalks & Erosion Control Improvements $2,224,190.00 Total Development Assurance Amounts $5,278,385.00 Streets, Sidewalks & Erosion Control Improvements 3.5% $1,779,352 $62,277.32 Water 3.5% $645,646 $22,597.61 Wastewater 3.5% $814,613 $28,511.46 Drainage 3.5% $983,097 $34,408.40 The final construction amount is [$4,222,708], and the Public Improvement Inspection fee amount is [$147,794.79] (the “Final Fiscal Guaranty Amountâ€�). RECOMMENDED: Xxxx Xxxxxxxxx, P. E. Date City Engineer
Street Improvements.ĚýLead Developer agrees to design and construct the following arterial street improvements through the City’s executive order construction process: a. S. 00xx Xxxxxx xxx Xxxx Xxxx Xxxx. Lead Developer will design and install new striping for the westbound to southbound left turn lane at the intersection of S. 00xx Xxxxxx xxx Xxxx Xxxx Xxxx. In addition, Lead Developer will coordinate with the City to install a new traffic signal head for westbound traffic at said intersection. The restriping of the turn lane and installation of the additional traffic signal head shall be referred to herein collectively as the “Pine Lake Road Improvementsâ€�. b. Xxxxx 00xx Xxxxxx xxx Xxxxxx Xxxx Xxxx. Lead Developer will design and construct or install the following improvements in South 00xx Xxxxxx xxx Xxxxxx Xxxx Xxxx at the intersection of said streets. Said improvements shall be made through the City’s executive order construction process. The specific improvements are as follows: i. Design and install new traffic lane striping for the westbound to southbound left turn lane and install the associated signal head addition ii. Design and install new traffic lane striping for the eastbound to northbound left turn lane and install the associated signal head addition iii. Design and install new traffic lane striping for the southbound to eastbound left turn lane and install the associated signal head addition iv. Design and construct a new westbound to northbound right turn lane with a minimum 235â€� allowance for storage and an additional 45â€� for deceleration. The improvements described above in Subsections 2.b.i-iv. shall be collectively be referred to throughout this Agreement as the “South 40th and Yankee Hill Road Improvementsâ€�. c. South 40th and Grainger Parkway. Lead Developer will design and construct or install the following improvements in Xxxxx 00xx Xxxxxx and Grainger Parkway at the intersection of said streets. Said improvements shall be made through the City’s executive order construction process. The specific improvements are as follows: i. Design and construct a northbound to eastbound right turn lane with a minimum 80â€� of vehicle storage in S. 40th Street. The construction of this new turn lane shall include the relocation of the existing traffic signal pole located generally at the southeast corner of the intersection. ii. Design and construct those improvements necessary to create a combined traffic lane to facilitate both eastbound through movements and southbo...
Street Improvements.ĚýOwner shall furnish and install, at its own expense, the street improvements in conformance with the drawings, plans and specifications accepted by Firestone and in accordance with the PIP.
Street Improvements.ĚýFor the purposes of this Agreement, “street improvementsâ€� shall be defined to include, where applicable, but not limited to, all improvements within the right-of-way such as bridges, sub-base preparation, road base, asphalt, concrete, seal coat, curb and gutter, medians, entryways, underground utilities, sidewalks, bicycle paths, traffic signs, street lighting, street name signs, landscaping and drainage improvements. Street improvements other than curbs, gutters, walks and signs, shall not be installed until all utility lines to be placed within the right-of- way have been completely installed, including individual lot service lines leading in from the main to the property line. All street improvements shall be constructed and installed, at the minimum, pursuant to Town-approved plans, specifications, required permits, and the Schedule of Improvements attached as Exhibit “Bâ€�.
Street Improvements.ĚýDeveloper agrees to construct the following streets, including curb, gutter and sidewalk as part of the Development: a. Bluebird Drive between South Wind River Drive and Pearson Road as platted or replatted and filed at the Converse County Court House; b. Swallow Street between South Wind River Drive and Pearson Road as platted or replatted and filed at the Converse County Court House; and x. Xxxxxxx Road between Flicker Street and Meadow Lane as platted or replatted and filed at the Converse County Court House.
Street Improvements.ĚýThis Contract is subject to the rights of the State of Minnesota, Hennepin and Ramsey County or the City to improve their highways and streets. The Contractor accepts the risk that such improvements may prevent the Contractor from traveling its accustomed route or routes for the purpose of collecting materials. Contractor agrees not to make any claim for compensation against the City for such interference. The City will, whenever possible, provide advanced information and instructions about how the Contractor may best provide services in an improvement area.
Street Improvements.ĚýThe distribution of costs between the City and the Developer for all street improvements being part of the Public Infrastructure Improvements are as follows: Full Project Cost Developer Amount City Participation Streets & Sidewalks $118,611 $118,611 $0.00 Erosion Control Items $48,059 $48,059 $0.00 Total Construction Cost $166,670 $166,670 $0.00 2.40 Summary of Infrastructure (Development) Costs Amounts Final Assurance Amount Water Facilities $649, 692 Sewer Facilities $339,174 Storm Drainage Facilities $503,179.18 Streets, Sidewalks & Erosion Control Improvements $166,670 Total Infrastructure Development Cost Amounts $1,658,715.18 Streets, Sidewalks & Erosion Control Improvements 3.5% $166,670 $5,833.45 Water 3.5% $649, 692 $22,739.22 Wastewater 3.5% $339,174 $11,871.09 Drainage 3.5% $503,179.18 $17,611.27 The final construction amount is $1,658,715.18, and the Public Improvement Inspection fee amount is $58,055.03, or $2500, whichever is higher. RECOMMENDED: Xxxx Xxxxxxxxx, P. E. Date City Engineer
Street Improvements.ĚýThe distribution of costs between the City and the Developer for all street improvements are as follows: Streets $643,520.78 $643,520.78 $0.00 Erosion Control Items $54,600.00 $54,600.00 $0.00 Total Construction Cost $698,120.78 $698,120.78 $0.00
Street ImprovementsĚýa) Street improvements are required to be constructed in conformity with the Design Standards as set forth in Appendix A. b) Final surface for public streets should be delayed to avoid premature damage of final surface course. Final surface course should be installed after approximately 75% of the lots have experienced construction, as determined in the "Contract for Subdivision or Development Improvements", but not more than three years from substantial completion.